9:41
●●●●
📶
F
Foundation Engg. Co.
Bore Log System
Sign in · 01
Every bore,
recorded.
Capture pile foundation data right from the site, no paperwork required.
Username
Password
Remember me
Forgot?
Sign in →
FEC · v 2.4.1 · 2526
←
Bore Log Entry
Pile P-247
⌕
Step 03
of 05
60% Complete
Active Pile
P-247
CHANGE
Client
Fine Organic Industries (SEZ)
Project
SEZ — Phase II
Total Bore
16.40
m
Duration
6h 45m
Status
● Active
01
General Details
Dates · Rotary Rig
⌄
Boring Started
*
Concreted On
*
Rotary Rig
*
Bauer BG28 (FEC-04)
IMT AF180 (FEC-02)
Soilmec SR65 (FEC-07)
Charge Type
Standard
Express
02
Bore Measurements
Soil · Rock · Socket
⌄
Soil Bore
*
mtr
Rock Bore
*
mtr
Soft Rock
mtr
Rock Socket
mtr
03
Liner & Reference Levels
Casing, EGL, post-concrete
⌄
Liner & Casing
Liner Length
mtr
Casing Length
mtr
Actual
mtr
Casing Top
mtr
Reference Levels
[A] EGL — Existing Ground Level
mtr
Empty Bore (After Concrete)
mtr
Concrete Bore (After Concrete)
mtr
Time & Depth Log
Soil Bore
From → To
Time
Depth
Rock Bore
From → To
Time
Depth
04
Site Personnel
Operator, supervisor, crew
⌄
Operator
Bhivram
Suresh Patil
Site Supervisor
Mohd. Yusuf
Anil Deshmukh
Liner
— Select —
Mahesh Kumar
Fitter
— Select —
Vikram Singh
Muck Remover
— Select —
JCB-03
Labour
— Select —
Crew A — 6 men
05
Status & Remarks
Final notes
⌄
Pile Tested
Has integrity test been done?
Trial Pile
Mark if this is a trial pile
Remarks
Boring completed without obstructions. Light rainfall after 14:00.
Ready to submit?
Review the entries above before saving.
Save & Submit →
Save as Draft
Saved · just now
Login
Bore Log